USA

31 workers safely removed after part of industrial tunnel collapses in Los Angeles

Thirty-one workers have been safely removed from an industrial tunnel under construction in Los Angeles after part of it collapsed on Wednesday, the Los Angeles Fire Department said.

The collapse occurred 5 to 6 miles (8 to 9.7km) from the tunnel’s sole entrance in an industrial section of the city. Aerial footage from local television showed workers being lifted up through the tunnel’s entrance.

Some workers on the other side of the collapsed portion of the tunnel scrambled over a 12 to 15ft-tall (19.3 to 24.1m-tall) mound of loose soil and reached several coworkers on the other side.

AMN-GEN LOS ÁNGELES-TÚNEL-CAÍDA (AP)

The workers were then shuttled several at a time by tunnel vehicle to the opening.

Paramedics were evaluating 27 of the workers removed from the tunnel.

The tunnel is under construction to eventually carry wastewater. It’s 18ft (5.5m) wide, LAFD said. More than 100 LAFD workers were assigned to the scene, including those who specialize in rescues from confined spaces.

“LAFD has just reported that all workers who were trapped in the tunnel in Wilmington are now out and accounted for. I just spoke with many of the workers who were trapped. Thank you to all of our brave first responders who acted immediately,” Los Angeles Mayor Karen Bass said in a post on X.

  • For more: Elrisala website and for social networking, you can follow us on Facebook
  • Source of information and images “independent”

Related Articles

Leave a Reply

Back to top button

Discover more from Elrisala

Subscribe now to keep reading and get access to the full archive.

Continue reading